Project Status: Study
Estimated Cost: $26,400
Magisterial District: Tuckahoe
The purpose of this study is to develop a 10% conceptual design for pedestrian and cyclist improvements along Gayton Road between Pump Road and John Rolfe Parkway (approx. 1.5 miles). The primary focus will be on portions of Gayton Road that do not have pedestrian / cyclist facilities within these project termini.
Estimated Schedule: (Month Year) |
|||
|
We would like the public’s input on the Gayton Road study, please view the pre-recorded presentation and complete the survey linked below.
Comments are due by January 21, 2025.
Survey: Gayton Road Pedestrian and Bicycle Study John Rolfe Parkway to Pump Road