Gayton Road Pedestrian Improvements Study (Pump to John Rolfe)

Project Status: Study

Estimated Cost: $26,400

Magisterial District:   Tuckahoe  


The purpose of this study is to develop a 10% conceptual design for pedestrian and cyclist improvements along Gayton Road between Pump Road and John Rolfe Parkway (approx. 1.5 miles). The primary focus will be on portions of Gayton Road that do not have pedestrian / cyclist facilities within these project termini. 

 

Estimated Schedule: (Month Year) 

  • Study is underway.

We would like the public’s input on the Gayton Road study, please view the pre-recorded presentation and complete the survey linked below. 

Comments are due by January 21, 2025.

Survey: Gayton Road Pedestrian and Bicycle Study John Rolfe Parkway to Pump Road


Contact Us

Kevin Newcomb
(804) 501-5532
[email protected]


Public Works

Henrico Department of Public Works
4305 E. Parham Rd.
Henrico, VA 23228

Phone
(804) 501-4393

[email protected]

Mailing Address
P. O. Box 90775
Henrico, VA 23273-0775

Twitter Facebook

 
Google Translate Icon

Translate