Hungary Road Grade Separation

Project Summary

Project Status
Preliminary
Estimated Cost
TBD
Start Date
TBD
Estimated End Date
TBD
Magisterial District
Brookland   Fairfield

Project Description

A bridge over the railroad tracks on Hungary Road was recommended in the DC2RVA study conducted by the Virginia Passenger Rail Authority (VPRA). Henrico County is advancing preliminary design and completing a National Environmental Policy Act (NEPA) re‑evaluation for a new bridge that will carry vehicles, pedestrians, and bicyclists over the existing railroad tracks, replacing the existing at-grade crossing where vehicular traffic must stop for trains. The current funding only provides for a 30% design phase.  Future funding, as yet unidentified, will be required to progress beyond the 30% phase and will be dependent on input from various stakeholders.

 

Estimated Schedule: (Quarter Year)

  •  Preliminary Design began: 3rd Quarter of 2025
  •  Preliminary Design  completion anticipated: 2027

 

 

 

Amenities

  • Bike LanesBike Lanes
  • Roadway ReconfigurationRoadway Reconfiguration
  • Shared-Use PathShared-Use Path
  • SidewalkSidewalk