Woodman Road Improvements
Project Status: Underway - Design
Estimated Cost: $80 million
Start Date: 2030
Estimated End Date: 2032
Magisterial District: Brookland Fairfield
The County of Henrico is proposing to improve 1.75 miles of Woodman Road to provide a four-lane divided roadway between Hungary Road and Mountain Road. The project includes turn lane improvements, a shared use path, and sidewalk along the corridor. Pedestrian crossings with push buttons and count down timers will be provided at each signalized intersection.
Estimated Schedule
- Design is underway.
- Right-of-way acquisition is anticipated to begin in 2027.
- Utility relocation is anticipated to begin in 2028.
- Advertisement for construction is anticipated for 2030.
- Construction is anticipated to begin in 2030.
Progress to Date
-
- A public hearing was held July 24, 2025 from 5:30 pm to 7:00 pm at Brookland Middle School, 9200 Lydell Drive, Henrico, VA 23228. Meeting documents from this meeting can be found below.
- A public information meeting was held on Monday, May 13, 2024 from 5:30 pm to 7:00 pm at Brookland Middle School, 9200 Lydell Drive, Henrico, VA 23228.