Woodman Road Improvements

Project Status: Underway - Design

Estimated Cost: TBD
Start Date: 2030
Estimated End Date: 2032

Magisterial District:   Brookland   Fairfield  


Project Description:

The County of Henrico is proposing to:

Improve 1.75 miles of Woodman Road to provide a four-lane divided roadway between Hungary Road and Mountain Road. The project includes turn lane improvements, a shared use path, and sidewalk along the corridor. Pedestrian crossings with push buttons and count down timers will be provided at each signalized intersection.

Estimated Schedule: (Month Year) 

  • Design is underway
  • Right-of-way acquisition is anticipated to begin 2027
  • Utility relocation is anticipated to begin 2027
  • Advertisement for construction is anticipated in 2030
  • Construction is anticipated to begin 2030
  •  

Progress to Date

  • PUBLIC HEARING ORIGINALLY SCHEDULED FOR MARCH 4, 2025 IS POSTPONEDNEW DATE: A public hearing is planned for July, 24th from 5:30 pm to 7:00 pm at Brookland Middle School, 9200 Lydell Drive, Henrico, VA 23228. Meeting documents will be posted soon.
  • A public information meeting was held on Monday, May 13, 2024 from 5:30 pm to 7:00 pm at Brookland Middle School, 9200 Lydell Drive, Henrico, VA 23228. Meeting documents from this meeting can be found below.