Garden City Connector Trail

Project Status: Underway - Design

Estimated Cost: $5.4 million
Start Date: 2026
Estimated End Date: 2028

Magisterial District:   Fairfield  


The County of Henrico will be constructing a 12-foot-wide shared use path along the south side of Athens Avenue and Scott Road to Best Plaza Drive. This project will serve as a connection between the future Green City development and the Fall Line Trail. Improvements in addition to the trail include, but are not limited to: 

  • Installing a crossing at the signalized intersection of Brook Road and Athens Avenue. 
  • Construct a roundabout at the proposed development north of Scott Road. 

Estimated Schedule: (Month Year) 

  • Design is underway. 
  • Right-of-way acquisition is anticipated to begin 2025 
  • Utility relocation is anticipated to begin  2025 
  • Advertisement for construction is anticipated in  2026 
  • Construction is anticipated to begin 2026 

Contact Us

Sarah Briggs
(804) 501-4616
[email protected]


Public Works

Henrico Department of Public Works
4305 E. Parham Rd.
Henrico, VA 23228

Phone
(804) 501-4393

[email protected]

Mailing Address
P. O. Box 90775
Henrico, VA 23273-0775

Twitter Facebook

 
Google Translate Icon

Translate