Greenwood Road Bridge Repair
Project Status: Underway - Design
Estimated Cost: TBD
Start Date: TBD
Estimated End Date: TBD
Magisterial District: Brookland
The County of Henrico will be conducting bridge rehabilitation activities on the Greenwood Road Bridge crossing over CSX railroad tracks located between Old Washington Highway and the Henrico-Hanover County line. The following improvements will be constructed, including:
- Repair and rehabilitation of the bridge substructure.
- Repair and rehabilitation of the bridge superstructure, including bearing replacement.
- Guardrail System improvements.
- Concrete surface penetrate sealing of concrete elements
- Protective painting of superstructure elements.
Estimated Schedule:
- Design is underway.
- Right-of-way acquisition is complete.
- Utility relocation is complete.
- Advertisement for Construction is TBD.
- Construction coordination with CSX is TBD.
- Project completion is TBD.