Greenwood Glen & Magnolia Ridge Connector Trail

Project Status: Underway - Right of Way Acquisition

Estimated Cost: $1.3 Million
Start Date: 2026
Estimated End Date: 2026

Magisterial District:   Fairfield  


Project Description:

The County is building a shared use path from the cul-de-sac at the end of Greenwood Glen Drive to Correnty Drive. 

 

Estimated Schedule: 

  • Design is underway
  • Right-of-way acquisition is underway
  • Utility relocation is not anticipated 
  • Advertisement for construction is not anticipated
  • Construction is anticipated to begin 2026
 