Twin Hickory Lake Drive at Hickory Bend Drive Intersection Improvements

Project Status: Underway - Design

Estimated Cost: TBD
Start Date: 2nd Quarter, 2024
Estimated End Date: 2nd Quarter, 2024

Magisterial District:   Three Chopt  


Project Description:

Input was heard from the community and Henrico County will be constructing a temporary roundabout at the Twin Hickory Lake Drive at Hickory Bend Drive intersection. The focus of this installation is to improve safety and mobility.

 

Estimated Schedule: 

  • Design is underway.
  • Right-of-way acquisition is not anticipated.
  • Utility relocation is not anticipated. 
  • Advertisement for construction is not applicable.
  • Construction start date is 2nd Quarter, 2024

 

 

Progress to Date

  • A public meeting was held on April 15, 2024 at 4601 Twin Hickory Lake Dr, Glen Allen, VA 23059.
    • The exhibit and presentation from the meeting can be found in the Documents Section below.
  • A public meeting was held on March 4, 2024, at Twin Hickory Elementary School (4900 Twin Hickory Lake Dr Glen Allen, VA 23059)
  • A public information meeting was held on 8/7/2023, at Twin Hickory Elementary School (4900 Twin Hickory Lake Drive, Glen Allen, VA 23059)

Contact Us

Terrell Hughes
(804) 501-4390
[email protected]


Public Works

Henrico Department of Public Works
4305 E. Parham Rd.
Henrico, VA 23228

Phone
(804) 501-4393

[email protected]

Mailing Address
P. O. Box 90775
Henrico, VA 23273-0775

Twitter Facebook

 
Google Translate Icon

Translate