Solar Photovoltaic System – Fairfield Area Library
This page content is archived for historical purposes.
Project Summary
- Project Status
- Completed
- Start Date
- July 2021
- Actual End Date
- June 2022
- Magisterial District
- Fairfield
Project Description
A rooftop solar project is in design for the new Fairfield Area Library. The 268 kiloWatt system is projected to produce approximately 75% of the building’s electricity. Sun Tribe Solar will install, operate, and maintain the system and sell the solar electricity back to Henrico County at a reduced rate compared to grid electricity. Over the next 25 years, the system is estimated to save nearly $267,000 for Henrico taxpayers
