N Laburnum Avenue Pedestrian and Transit Improvements
Project Status: Underway - Right of Way Acquisition
Estimated Cost: $4.6 million
Start Date: 2027
Estimated End Date: 2028
Magisterial District: Fairfield
The County of Henrico will be constructing the following improvements along the eastern side of N Laburnum Avenue between Harvie Elementary School and previous Henrico County Fairfield Library:
- Approximately 2,250 linear feet of 5’ wide sidewalk, curb ramps and crosswalks.
- Approximately 900 linear feet of new curb and gutter and storm drainage system.
- Lane widening of approximately 9’ to match adjacent pavement widths in some locations, a wooden bridge to avoid extending two box culverts.
- Improvements to two bus stops that could include shelters and other amenities.
- Ten dedicated park and ride spaces will be identified in the parking lot of the Eastern Henrico Recreation Center.
Estimated Schedule
- Design is underway.
- Right-of-way acquisition began 3rd Quarter, 2025.
- Utility relocation is anticipated to begin 2nd Quarter, 2026.
- Advertisement for construction is anticipated 2027.