Creighton Road Sidewalk
This page content is archived for historical purposes.
Project Summary
- Project Status
- Completed
- Estimated Cost
- $500,000
- Start Date
- June 2022
- Estimated End Date
- September 2022
- Magisterial District
- Fairfield
Project Description
This project involves the design and construction of approximately 1,100 feet of a new 5-foot wide sidewalk along the south side of Creighton Road between Harvest Crest Drive and Carolee Drive. The proposed sidewalk is to be constructed within existing right of way and maintain a 2-foot wide grass utility strip to match the existing sidewalk typical section along Creighton Road.
Estimated Schedule
- Design is complete.
- Right-of-way acquisition is complete.
- Utility relocation is complete.
- Advertisement is complete.
- Construction is anticipated June 2022.
- Project completion is anticipated September 2022.