Greenwood Road Bridge Repair

Project Summary

Project Status
Completed
Estimated Cost
1.8 million
Start Date
3rd Quarter, 2025
Estimated End Date
3rd Quarter, 2026
Magisterial District
Brookland

Project Description

The County of Henrico will be conducting bridge rehabilitation activities on the Greenwood Road Bridge crossing over CSX railroad tracks located between Old Washington Highway and the Henrico-Hanover County line.  The following improvements will be constructed, including: 

  • Repair and rehabilitation of the bridge substructure. 
  • Repair and rehabilitation of the bridge superstructure, including bearing replacement. 
  • Guardrail System improvements. 
  • Concrete surface penetrate sealing of concrete elements  
  • Protective painting of superstructure elements. 

Estimated Schedule:

  • Phase II design is completed.
  • Right-of-way acquisition is completed.  
  • Utility relocation is completed. 
  • Construction coordination with CSX is underway.
  • Construction completed.