High School Athletic Field Improvements: Henrico HS
Project Status: Completed
Estimated Cost: $1.95 Million
Start Date: January 2019
Estimated End Date: August 2019
302 Azalea Ave
Henrico, VA 23227
Magisterial District: Fairfield
This bond project will convert the existing natural grass football fields at all nine Henrico County Public Schools to tournament quality synthetic multi-purpose fields consisting of organic infill. The project will provide for new collegiate rubberized track surfacing at the school site by full depth asphalt replacement of the existing Henrico asphalt track. Grass D zones will be converted to rubberized track surfaces for track and field events. The construction project will include site-work/grading within the existing football stadium oval, underground drainage systems and storm water system improvements, and rework/replacement of the existing running track. Supporting construction activities required to complete the project will be included such as demolition work, earthwork/excess dirt removal, concrete and fencing work and compliance with the erosion and sediment control requirements. Sports furnishings to include goals, nets, and track & field elements are to be provided by the contractor.
Engineering Firms: Prime Firm (Draper Aden Associates) – Civil engineering, POD and construction administration. CHA worked as a sub-consultant to Draper Aden Associates to provide the field and track sports design services.
Construction Contractor: Medallion Athletic Products, Inc.