Libbie Avenue Road Diet

Project Status: Underway - Design

Estimated Cost: $4.6 million
Start Date: 2025
Estimated End Date: 2026

Magisterial District:   Brookland  


The County of Henrico will construct a combination of shareduse path and two-way bike lanes along the east side of Libbie Avenue between West Broad Street and Bethlehem RoadOn-street parking will be maintained between Libbie Mill West Boulevard/N. Crestwood Avenue and Lehigh Circle.  Lane reconfiguration will include removing the slip lane from northbound Libbie Avenue onto Libbie Mill West Boulevard and making the current right through lane a right-turn only lane.  Additionally, the dedicated right-turn lane between Libbie Mill West Boulevard and Indigo Road will be removed in the northbound direction and one through lane will be removed in the southbound direction between these two intersectionsA two-way center turn lane will be provided between Indigo Road and Bethlehem Road.      

 

Estimated Schedule: (Month Year) 

  • Design currently underway. 
  • Right of Way is underway. 
  • Utility relocations are anticipated to begin in 2025.
  • Advertisement is anticipated in 2025 
  • Construction is anticipated to begin 2025. 
  • Project completion is anticipated: 2026. 

Progress to Date

  • On Monday, October 7, 2024, the Henrico County Department of Public Works held a public information meeting from 5:30pm to 7:00pm at the Libbie Mill LibraryMaterials from the meeting can be found in the Documents section below. 

Contact Us

Sarah Briggs
(804) 501-4616
[email protected]


Public Works

Henrico Department of Public Works
4305 E. Parham Rd.
Henrico, VA 23228

Phone
(804) 501-4393

[email protected]

Mailing Address
P. O. Box 90775
Henrico, VA 23273-0775

Twitter Facebook

Category


 
Google Translate Icon

Translate