Ridge Road Sidewalk Phase 2
Project Status: Underway - Design
Estimated Cost: $6 million
Start Date: 2027
Estimated End Date: 2028
Magisterial District: Tuckahoe
The County of Henrico will be constructing accommodations to increase pedestrian access and connectivity. The following improvements will be constructed, including:
- Approximately 1,800-ft of new sidewalk along the north side of Ridge Road from Glendale Drive to N. Parham Road, and approximately 120-ft of new sidewalk along the south side of Ridge Road from Old Providence Circle to Greene Ridge Road.
- Approximately 690-ft of new shared use path along the north side of Ridge Road from Greene Ridge Road to Glendale Drive.
- Approximately 20 ADA compliant ramps.
Estimated Schedule: (Month Year)
- Design is underway
- Right-of-way acquisition is anticipated to begin 2nd Quarter 2026
- Utility relocation is anticipated to begin 3rd Quarter, 2027
- Advertisement for construction is anticipated to begin 4th Quarter, 2026
- Construction is anticipated to begin 2027
Progress to Date
A Public Hearing was held on 5/12/2025, at the Tuckahoe Library (TU Meeting Room), 1901 Starling Drive, Henrico, VA 23229, from 5:30pm to 7:00pm.