W. Broad Street & Glenside Drive Intersection Improvements
Project Status: Underway - Design
Estimated Cost: $12.2 million
Start Date: 2028
Estimated End Date: 2030
Magisterial District: Brookland Tuckahoe
Project Description:
The County of Henrico will be constructing accommodations to improve pedestrian and vehicular infrastructure as well as safety and accessibility at the intersection. The following improvements will be constructed:
- Third through lane on Glenside Drive southbound
- Widening of Glenside Drive northbound to accommodate a second dedicated left-turn and a second dedicated through lane
- Sidewalk along the west side of Glenside Drive
- Pedestrian crossings with curb ramps, marked crossings, and pedestrian signals on the west and north legs of the intersection
- Bus shelter on the east side of W. Broad Street just north of Glenside Drive
Estimated schedule:
- Design is underway.
- Right-of-way acquisition is anticipated to begin in 2027.
- Utility relocation is anticipated to begin in 2028.
- Advertisement for constructed is anticipated for 2028.
- Construction is anticipated to begin in 2028.