I-295 Woodman Interchange
Project Status: Study
Estimated Cost: $350,000
Magisterial District: Fairfield
The County is conducting a Study to determine the operational / safety needs for the I-295 Woodman Rd Interchange and develop alternatives to address those concerns.
|
|||
Estimated Schedule: (Month Year)
|