Twin Hickory Lake Drive at Hickory Bend Drive Intersection Improvements
This page content is archived for historical purposes.
Project Summary
- Project Status
- Underway - Design
- Estimated Cost
- TBD
- Start Date
- 2nd Quarter, 2024
- Estimated End Date
- 2nd Quarter, 2024
- Magisterial District
- Three Chopt
Project Description
Project Description:
Input was heard from the community and Henrico County will be constructing a temporary roundabout at the Twin Hickory Lake Drive at Hickory Bend Drive intersection. The focus of this installation is to improve safety and mobility.
Estimated Schedule:
- Design is underway.
- Right-of-way acquisition is not anticipated.
- Utility relocation is not anticipated.
- Advertisement for construction is not applicable.
- Construction start date is 2nd Quarter, 2024
Progress to Date
- A public meeting was held on April 15, 2024 at 4601 Twin Hickory Lake Dr, Glen Allen, VA 23059.
- The exhibit and presentation from the meeting can be found in the Documents Section below.
- A public meeting was held on March 4, 2024, at Twin Hickory Elementary School (4900 Twin Hickory Lake Dr Glen Allen, VA 23059)
- A public information meeting was held on 8/7/2023, at Twin Hickory Elementary School (4900 Twin Hickory Lake Drive, Glen Allen, VA 23059)