Wilkinson Road Culvert Replacement

Project Status: Underway - Construction

Estimated Cost: $6.9 million
Start Date: 3rd Quarter, 2023
Estimated End Date: 2025

Magisterial District:   Fairfield  


The County of Henrico will be constructing three bridges over Upham Brook between Wilkinson Estates Drive and Pony Farm Drive.  The following improvements will be constructed, including:

  • Removal or abandonment in place of the five existing box culverts within the project area. 
  • Construction of a 70-foot single span bridge and two 40-foot single span bridges on existing alignment. 
  • Improvements to the bridge approach roadways within the project corridor. 
  • Improvements to the guardrail system.

 

 

Estimated Schedule

  • Design is complete. 
  • Right-of-way acquisition is complete. 
  • Utility relocation is complete. 
  • Advertisement for construction is completed. A contractor has been selected for this project. 
  • Construction is currently underway. 
  • Project completion is anticipated in 2025. 

Contact Us

Robert Whitaker III
(804) 727-8253
[email protected]


Public Works

Henrico Department of Public Works
4305 E. Parham Rd.
Henrico, VA 23228

Phone
(804) 501-4393

[email protected]

Mailing Address
P. O. Box 90775
Henrico, VA 23273-0775

Twitter Facebook

 
Google Translate Icon

Translate