Roadway Defect Bond (Assignment of Certificate of Deposit)
Cash – Checks payable to County of Henrico
Letter of Credit for Defect Bond for Street Acceptance
Information for Submitting Environmental Compliance Agreements
Environmental Compliance Agreement (required with 1 of 3 forms below)
1) Assignment for Environmental Compliance Measures
2) Letters of Credit (Example)
3) Cash/Checks
Construction Escrow Bond Letter of Credit
Assignment for Unimproved Drive Aprons
Right-of-Way Maintenance Agreement
(ALL MUST INCLUDE • Virginia Land Record Cover Sheet – Quick Reference Page): https://eapps.courts.state.va.us/help/robo/vlrcs/deed_calculator/index.htm#t=vlrcs_deedcalculator_quickref.htm
• Virginia Land Record Cover Sheet Generator: http://vlrcs.courts.state.va.us/?circuitName=henrico&lrcsReq=y
Declaration of Covenants for Inspection & Maintenance of Stormwater Management Facilities (for Proprietary Devices)
Declaration of Covenants for Inspection & Maintenance of Stormwater Management Facilities (for Vegetated Roofs, Permeable Pavement, Wet Ponds, & Practices with Enclosed/Confined Space or Underground Chambers such as Sand Filters and Cisterns)
Declaration of Covenants for Inspection and Maintenance of Stormwater Management Facilities (for other practices)
(ALL MUST INCLUDE • Virginia Land Record Cover Sheet – Quick Reference Page): https://eapps.courts.state.va.us/help/robo/vlrcs/deed_calculator/index.htm#t=vlrcs_deedcalculator_quickref.htm
• Virginia Land Record Cover Sheet Generator: http://vlrcs.courts.state.va.us/?circuitName=henrico&lrcsReq=y
Consent Agreement for Working in Right-of Way
Permit Form to Work in Henrico County Right-of-Way with Attached Provisions
SPA (Stream Protection Area) Agreement
(ALL MUST INCLUDE • Virginia Land Record Cover Sheet – Quick Reference Page): https://eapps.courts.state.va.us/help/robo/vlrcs/deed_calculator/index.htm#t=vlrcs_deedcalculator_quickref.htm
• Virginia Land Record Cover Sheet Generator: http://vlrcs.courts.state.va.us/?circuitName=henrico&lrcsReq=y
Agreement in Lieu of an Erosion and Sediment Control Plan
Agreement in Lieu of a Stormwater Management Plan
SWPPP Tabs for Plan Review/Approval
- Tab 01 TITLE SHEET
- Tab 03 REQUIRED SWPPP COMPONENTS
- Tab 04 NARRATIVE
- Tab 07 THE ENVIRONMENTAL COMPLIANCE PLAN AND OTHER INCORPORATED PLAN
- Tab 08 POLLUTION PREVENTION PLAN INFORMATION
- Tab 09 TOTAL MAXIMUM DAILY LOAD INFORMATION
- Tab 14 GCP TERMINATION
- Tab 15 REGISTRATION STATEMENT GENERAL VPDES PERMIT
Stormwater Management Facility Acceptance
CBRPA Exception Request Pre-Application Questionnaire